Mokokchung: In view of the blasting work for the construction of Two-Lane of Changtongya – Longleng Road from existing Km 0.0 to Km 16.592, Deputy Commissioner, Mokokchung, Sashank Pratap Singh, IAS, has informed that all vehicular movements along the Changtongya – Longleng Road is restricted from 9 pm to 6 pm with effect from 1 September 2022 for 30 days.